THE LANGUAGE OF LOGISTICS 14 TERMS
Measurement and labour
Measurement and labour: 14 warehouse and WMS terms defined in Turkish and English, with related terms and in-depth guides.
Search English or Turkish names and abbreviations. Accents are optional: aging, yaslandirma, FIFO…
Search covers every term in every category.
No term matches your search.
Terms
- Measurement and labourCapacity plan
-
Deriving people, equipment and space needs from expected volume. Campaign and seasonal peaks are calculated separately.
See also: Wave, Warehouse KPIs
- Measurement and labourCube utilisation
-
How much of a rack’s or vehicle’s fillable volume is actually filled. Low use wastes rent; overfill causes damage and lost access.
See also: Location capacity, Dimensional weight
- Measurement and labourDock-to-stock time
-
Time from goods hitting the dock to becoming sellable stock. The clearest measure of receiving bottlenecks.
See also: Goods receipt, Warehouse KPIs
- Measurement and labourDwell time
-
How long goods or a vehicle sit at a point (door, staging, quarantine). Rising dwell is a flow problem, not a capacity one.
See also: Dock-to-stock time, Staging, Dock scheduling
- Measurement and labourInventory accuracy
-
How closely system quantity matches physical quantity. Measured per location; measuring it per SKU tends to overstate the real picture.
See also: Cycle count, Warehouse KPIs
- Measurement and labourLabour management (LMS)
-
Comparing task times with standards to measure performance. Applied without fair standards, it erodes trust.
See also: Lines per hour, Warehouse KPIs
- Measurement and labourLines per hour
-
Pick lines an operator completes per hour. The effect of method and layout changes shows here first.
See also: Warehouse KPIs, Picking
- Measurement and labourOEE (overall equipment effectiveness)
-
Machine yield as availability × performance × quality. It is meaningful for a sorter or AS/RS; it does not map cleanly onto human picking.
See also: Warehouse KPIs, AS/RS (automated storage and retrieval), Sorter
- Measurement and labourOrder accuracy
-
The share of orders shipped without error. It maps directly to customer complaints and return cost.
See also: Warehouse KPIs, Returns management
- Measurement and labourOTIF (on time in full)
-
The share of orders delivered both on the promised date and complete. Missing either condition disqualifies the order.
See also: Warehouse KPIs
- Measurement and labourPerfect order
-
The right item, quantity, documents, time and an undamaged delivery. A composite measure that folds document and damage into OTIF.
See also: OTIF (on time in full), Order accuracy, Fill rate
- Measurement and labourStock coverage (days of supply)
-
How many days of expected demand available stock can cover. A simple calculation is available quantity divided by average daily demand. The ratio is not meaningful at zero demand; seasonal demand may require a forecast.
See also: Inventory turnover, Safety stock, Reorder point
Reference: Mecalux
- Measurement and labourTask interleaving
-
Combining outbound and return tasks in one trip to cut empty travel, e.g. a nearby pick after putaway. Distance and equipment limits must be written into the rule.
See also: Directed work, Putaway
- Measurement and labourWarehouse KPIs
-
Indicators that measure operations: lines per hour, order accuracy, on-time shipping, inventory accuracy, dock turnaround. An unmeasured improvement claim cannot be verified.
See also: Lines per hour, Order accuracy, OTIF (on time in full)
Categories
Related pages
If a definition looks wrong or incomplete, write to info@wmsturkiye.com with a source. Corrections follow our editorial policy. editorial policy